MCARTHUR RIVER MINE
It was time for a change of pace, when McArthur River Mine- Glencore, located at Borroloola, enlisted us to provide our services in the upgrade to their synthetic cricket pitch. The area was approximately 308m².
Scope of works included:
●Removal of existing synthetic cricket wicket turf
●Preparation of the existing concrete slab, including grinding to remove any foreign materials left behind from the
removal of the existing turf
●Supplied and installed APT 12mm Shield and KDK cricket wicket synthetic turf with white line cut in for line
marking
●Site detailing before handover of the upgraded pitch